UNDERWAY! 2025 Wall Calendar / W.W. II SPECIAL EDITION

NOW AVAILABLE -
CLICK HERE
For RATING SHIRTS - Click on your Rating Abbreviation below:


U.S.S. SALISH

(ATA-187)


Click to view crew list
 

USS SALISH (ATA-187) - a Sotoyomo-class auxiliary fleet tug

In Commission 1944 to 1972

ATA-187 Deployments - Major Events

Add a ATA-187 Shellback Initiation Add a ATA-187 Deployment - Major Event
Month Year to Month Year Deployment / Event
AUG1944-Keel Date: 29 AUG 1944
SEP1944-Launch Date: 29 SEP 1944
DEC1944-Commissioned: 7 DEC 1944
MAY1959-JUN1959Tongue of the Ocean Bahamas. Deep Sea 3 Point Mooring
JUN1960-DEC1960Project Artemus/Install Argus Island Bermuda
OCT1963-OCT1963Towing ex USS FOGG from Norfolk Va. ran into Hurricane Ginny
FEB1972-Decommissioned: 10 FEB 1972
FEB1972-FEB1972Transferred to Argentina Navy as :ARA Alferez Sobral A-9

ATA-187 General Specifications

Complement: 45 to 49 Officers and Enlisted

Displacement: 835 tons

Length: 143 feet

Beam: 33 feet 10 inches

Draft: 13 feet 2 in

Flank Speed: 13 knots



USS SALISH (ATA-187)



ATA-187 (ex-ATR-114) was laid down on 29 August 1944 by the Levingston Shipbuilding Co., Orange, Tex.; launched on 29 September 1944; and commissioned on 7 December 1944, Lt. Thomas G. Lewis in command.

Designated for duty with Service Division 101 in the Pacific, ATA-187 completed shakedown early in January 1945, and departed New Orleans for Hawaii on the 18th with APL-10 in tow. She reached Pearl Harbor on 4 March; exchanged the barracks ship for two lighters; and continued across the Pacific. At Guam, she changed tows again and sailed for the Ryukyus pulling two floating derricks. On 22 April, she delivered her charges to the Hagushi anchorage, Okinawa; then, retraced her route back to Guam, whence she made a second run, with a power barge and a yard ferry, to Okinawa. She completed that run at Buckner Bay on 22 May; assisted in downing an enemy bomber the next day; and, at the end of the month, departed for Ulithi and the Philippines. From the former, she towed an oil barge and two lighters to the latter, arriving in San Pedro Bay, Leyte, on 27 June.

Then ordered east, the ocean-going, auxiliary tug cleared San Pedro Bay in mid-July and entered San Francisco Bay on 17 August, two days after the cessation of hostilities in the Pacific. Overhaul took her into September; and, on the 12th, she resumed towing activities with a run from Astoria, Oreg., to Pearl Harbor. During October, she delivered barracks ships to Eniwetok. In November, she commenced target towing services for surface and aviation units training in Hawaiian waters. In April 1946, she completed a run between Hawaii and California; then returned to Hawaii to prepare for Operation "Crossroads," the atomic bomb test series scheduled for the summer at Bikini.

In May, the ATA joined Joint Task Force I and moved into the Marshalls, where, into the fall, she provided towing services. On 26 November 1946, the tug received final radiological clearance and headed for New Orleans, her new home port.

On 20 January 1947, the ATA, named Salish on 16 July 1948, arrived at New Orleans, her base for the next 14 years. During that period, towing activities, for the active and reserve fleets, took her between gulf, east coast, and Caribbean ports. Support operations saw her off the Texas coast for radio experiments run by the University of Texas between July and September 1947; off the Virginia capes and in the British West Indies for survey and cable laying operations from June to December 1956 and from October to December 1959; in the Bahamas for mooring operations in May and June 1959; and in the Bermuda Islands for cable laying operations from June to September 1960.

In July 1961, Salish was transferred to the east coast and, for the next ten years, was homeported at Mayport, Fla. From there, she continued her diverse towing operations; but, was assigned, more frequently than before, to support experimental projects, including the MONOB I and Flip projects, and to cable-laying and mooring operations off the Florida coast, in the Bermuda area, and in the Caribbean.

Ready for rescue and assistance operations throughout her career, she was herself the recipient of aid in October 1963 when she was damaged by hurricane Ginny while towing a DE. Relieved of her tow by a Coast Guard tug, she underwent repairs and, in November, resumed her services to the fleet. Two of her most notable salvage missions came in April 1966 and in January 1971. During the first, she assisted fire-fighting and salvage operations for MV Viking Princess which was located, on fire and drifting, in the Windward Passage. The second involved the storm damaged Brazilian freighter, Amazonia, loaded with lye, malt, raw plastics, bulk newsprint, and heavy mining equipment. For the latter operation, conducted off Bermuda, she was awarded the Meritorious Unit Commendation.

In November 1971, Salish returned to Mayport from three weeks duty providing services to Fleet Training Group, Guantanamo Bay, Cuba, and prepared for transfer to the Argentine Navy. She was decommissioned on 10 February 1972; transferred the same day; and recommissioned in the Argentine Navy as Alferez Sobral.

ATA-187 received one battle star for her World War II service.

[Note: The above USS SALISH (ATA-187) history may, or may not, contain text provided by crew members of the USS SALISH (ATA-187), or by other non-crew members, and text from the Dictionary of American Naval Fighting Ships]